The Basement Office/Rec Room

When designing the house we made sure that the basement ceiling was at least nine feet high. The plan was to remodel it for a office/rec room. The basement was used as ad hoc storage when we first moved in and was full wall to wall.

The original plan was to use the one side of the basement for the rec room. This would require people to walk through an unfinished storage area. It was decided to move the storage area to the other side and make the room L-shaped thus incorporating the stairs into the room.

What's Next (4/07) : Will string the electric and work on completing the framing around the basement door and stairs.

Future basement floor plan.
Rendered images of what the basement might look like after remodeling.
 

The first winter Sean built storage shelves to help organize the vast quantity of stuff. (12/05)

These shelves hold allot as they are four feet deep.

Both boys hard at work adding the wall along the steps. (2/06)

Framed down the middle first as this was the easiest to get at. (2/07)

This is the other end of the basement along the utility room.

A closet under the stairs is a perfect place for storage. (2/07)

The first wall is completed and even insulated. The insulation is loose for now. This area will end up being a storage room.

Started down the long wall. Had to offset the wall from the foundation because of the piping leading to the septic tank. Will end up building a closet to cover the clean out. (2/07)

Have to deal with some more piping. Didn't have to offset the wall but will probably build another closet to cover it. (2/07)

Couldn't build the walls the traditional way on the floor because of all the stuff we still have to sort through. Each board was hand fitted into place. (2/07)

Moved everything again so that work can begin on the storage room. (2/07)

Our next move is to finally sort though all this stuff as we really haven't needed it in over a year now.

Completed shelves on one side of storage room. (3/07)

Finished the storage room. The kids loved playing on the shelves. (3/07)

Added the framing near the stairs. The platform will be raised so that a wall with door can be added to enclose the utility room. (4/07)  

Updated 4/15/07